H&M shopfitting refit hm-home-refit

  • LOCATION: Manchester, Trafford Centre

  • PROJECT TYPE: Refit

  • DURATION: 5 Weeks Strip-out, 13 Weeks Build

  • SIZE: 2452.15 m2

Description:

This was a 2-floor store with expansion into a neighbouring unit to increase store square footage and include the HOME brand. The existing store was stripped back completely to create the blank canvas necessary to build from, this included all services. Extensive redesign and internal fabrication to bring about the new store concept was required here. This included but wasn’t limited to: Structural works (including new steels to the shopfronts), new internal walls and back of house layout, new wall linings, column boxings, metal skirtings, new balustrade systems as well as bespoke joinery were a requirement here.

Delivered with LEAN construction and Collaborative Planning been the backbone to its successful delivery.

Privacy Settings
We use cookies to enhance your experience while using our website. If you are using our Services via a browser you can restrict, block or remove cookies through your web browser settings. We also use content and scripts from third parties that may use tracking technologies. You can selectively provide your consent below to allow such third party embeds. For complete information about the cookies we use, data we collect and how we process them, please check our Privacy Policy
Youtube
Consent to display content from - Youtube
Vimeo
Consent to display content from - Vimeo
Google Maps
Consent to display content from - Google